Web8.2 Specification of earthworks by SHW approach 8.2.1 Required documentation. The appropriate appendices should be provided to enact several of the SHW clauses. As a minimum Appendix 6/1 (including Table 6/1), Appendix 6/2 and Appendix 6/3 should be provided. Appendices 6/8, 6/12, 6/14 and 6/15 should usually be provided. 7.3 Design of slopes 7.3.1 Methods of design of soil slopes The designer may … 7.5 Earthworks drainage systems 7.5.1 Pre-earthworks drainage The earthworks … 6.3 Desk study 6.3.1 General A desk study is an essential prerequisite for planning a … Government policy encourages the use of these materials; this is captured in SHW , … 9.7 Workplace transport practices Good working practices should be adopted to … 11.8 Renewal/remedial works Reference should be made to CIRIA C591 [29] and … 7.6 Embankments and filled areas 7.6.1 Design of embankments and filled areas. … 7.6.9 Filling into water 7.6.9.1 Standing water NOTE Standing water is the term … WebAppendix 7/1. For the purpose of this specification all references to BS EN 12591 bitumen grade penetration 100/150 in BS 4987 ‗Coated macadams (asphalt concrete) for roads and other paved areas‘ shall be replaced by IS EN 12591 bitumen grade penetration 70/100. In addition, when 70/ ...
NATIONAL HIGHWAY SECTOR SCHEMES FOR QUALITY MANAGEMENT IN HIGHWAY WORKS …
WebAppendix 15/1, arrange to have delivered by the Overseeing Organisation, all cables, cabinets and ancillary items listed in Appendix 15/1 which the Contractor shall subsequently unload, store and install; and (ii) unless otherwise described in Appendix 15/1, supply, deliver and install the cable ducts and chambers, in compliance WebBS EN 772-2 as described in Appendix 24/1. Amendment - May 2008 3 2408 Reconstructed Stone 1 (05/08) Reconstructed stone shall be used only in blockwork and shall comply with BS EN 771-5 and any particular requirements described in Appendix 24/1. 2409 Natural Stone 1 Building stone shall be of the type and quality described in Appendix 24/1. irene south dakota weather
Help & Support - Standards for Highways
http://origin.standardsforhighways.co.uk/ha/standards/mchw/vol1/pdfs/appendix_h.pdf WebAppendix 5/1: Drainage Requirements 1. Drawings and Schedules 1.1. The Contractor shall construct the works in accordance with the following: (i) the Specification for Highway Works (SHW) (ii) the Numbered Appendices to the SHW (iii) the Drainage Plans (iv) the Drainage Schedules (v) the Highway Construction Details (HCDs) WebAppendix 30/12: Special Ecological Measures and HCD/H45 8 Fenced Tree Guards Not used. 9 Preservation of Timber i) Preservation of timber shall comply with MCHW Specification for Highway Works (SHW) Clause 311. 10 Other i) Lifebuoy stations shall be provided at each balancing pond. Lifebuoy ordering concrete for slab